 Effective June 1, 2019 the 2015 ICC family of codes, have been adopted with local amendments including the One and Two Family Residential Code

Contact Us

  • To schedule an inspection or for general questions, call:  Note: You must schedule an inspection at least 48 hours in advance.    
    • 314-822-5823
    • 314-822-5816
    • 314-984-6943   
  • For plan review and permitting, contact the Plans Examiner, Russell Todd:  314-822-5817

Here is a full, downloadable list of contact information for staff in the Building Commissioner's Office.

Services

Permit Applications

For Driveway, Excavation, Parking lot and Grading permits visit the Engineering page

Boards and Commissions- Calendar

Other Information

Work Flow Chart for demolition and building permits 

The items required to be submitted to obtain full plan review and approval for a new Single Family Residence in the city of Kirkwood are:
1) Full construction plans signed and sealed by an architect registered in the state of Missouri
2) Site plan signed and sealed by an engineer registered in the state of Missouri showing existing and proposed grades, driveway and sidewalks and drainage plan, etc.
3) Truss drawings signed and sealed by an engineer registered in the state of Missouri
4) HVAC plans and heat loss/gain calculations
5) Cover sheet of the installation instructions for pre-fabricated fireplace (including direct-vent and ventless) the full installation instructions shall remain on the job site for reference by the inspector
*Two copies of the above are required to be submitted. One copy of the above will be returned to the applicant stamped and signed by the plan reviewer with any notes attached for builder reference.

When applying for a permit, two sets of all building documents, drawn to scale, are required for residential permits. Three sets are required for commercial permits.

Missouri Minimum Boundary Survey Required: Two copies of a Missouri Minimum Boundary Survey, sealed by a Land Surveyor or Engineer within the last 24 months, must be submitted for all new construction, additions, lot coverage, floor area ratio, pools, and detached accessory structures.

Review Time: Review time for single-family new homes  and commercial construction is 10 to 14 days . The review time for all other permits is 7 to 10 days.

Listing of fees: Fees Resolution 105-2018

International Code Ordinances

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer