Spotlight

IS THERE A LITTLE ORANGE FLAG IN YOUR YARD?  OR MAYBE SOME ORANGE PAINT MARKINGS?

If there are flags or markings in or on your yard or near your yard, it means somebody – a neighbor or someone planning to do construction work near your yard – has called Missouri One Call Systems to have all nearby utilities located.  When someone is going to dig up the ground for any reason, they are required to locate utilities first.  The company that locates the utilities will come out and mark with paint all the utility locations in the vicinity so that whoever is digging will not dig up a utility line.  Now you can find out what’s going on simply and easily.

Missouri One-Call Systems (MOCS) has added a helpful feature to their Website – the ability to research utility-locating work by area.  “Ticket Search” gives the general public the ability to obtain information about utility-locate work being done in their area, who’s digging in a specific area, and what they are doing.  Users can search by ticket number, if they have one, or they can define the search using other criteria such as date, address, excavator name, etc.  Click here to go directly to the "Ticket Search" page.

Public Works

Building Commissioner

The Building Commissioner's Office is a division under the department of Public Works, overseeing Property Maintenance, Building Permits, Occupancy Permits, and Building/Zoning Code Enforcement.

A Note about NEW Plan Review Requirements:
Effective April 28, 2011:

1)
When applying for a permit, two sets of all building documents, drawn to scale, are required for residential permits.  Three sets are required for commercial permits.
2) Missouri Minimum Boundary Survey Required:  TWO COPIES of a Missouri Minimum Boundary Survey, sealed by a Land Surveyor or Engineer within the last 24 months, must be submitted for all new construction, additions, lot coverage, floor area ratio, pools, and detached accessory structures.
3) Review Time:  Review time for single-family new homes is 10 days to two weeks.  The review time for all other permits is seven to 10 days.

International Code Ordinances:
~ Plumbing Code
~ Amending Building Code Condemnation Proceedings - Costs
~ Fuel Gas Code
~ International Building Code
~ International Fire Code
~ International Mechanical Code
~ International Residential Code - One- and Two-Family Dwellings

OBTAINING A CONTRACTORS' BUSINESS LICENSE IN KIRKWOOD:  Click here for the application and instructions.

OBTAINING A BUSINESS LICENSE IN KIRKWOOD (NOT a Contractors' License)
:  The process to obtain a business license begins with the Finance Department.  Go here for a complete description of the process.

NEW ELECTRONIC SIGN CODE ORDINANCE (Click here for a copy)

Building Commissioner:  Jack Schenck
Email:  schencjw@kirkwoodmo.org
Phone: 314-822-5814

To schedule an inspection, please call 314-822-5823.